Face Fixing

 

Suitable for application on both existing and new constructions

Face Fixing allows SOLIDAL® T3® (3mm) and T4® (4mm) Solid Aluminium to be installed in a few easy steps using rivets.

The use of proper Thermal Insulation Panels and Weather Membrane is required.

 

After sized to measure, holes are drilled at marked positions without removing the protective film on SOLIDAL® surface. Protective film should only be removed on the small area around the hole before riveting and from the rest of the panel, immediately after installation.
Sub-girts to be packed out in a plum vertical plane using packers. It is recommended that the installation begins at the bottom run of the wall. Install panels across the bottom of the wall and then step up, repeat process.


Contact SOLIDAL® or your rivet manufacturer for information on color matching and for general guidelines and recommendations.

Technical Data Sheet
Face Fixing Details
SOLIDAL® Fabrication Brochure
Show More

SOLIDAL® T3® (3mm) and T4® (4mm) Solid Aluminium panels can be supplied in standard sizes or cut to measure according to project requirements.

© 2019 Watermark® International Pty Ltd. All rights reserved.